Superconducting cable projects
A public reference table of high-temperature superconductor (HTS) cable and power-system projects worldwide: grid cables, fault current limiters and rail feeds, with lengths, superconductor chemistry, cooling systems, suppliers and sources. Listed newest first.
New to superconducting cable? See what is inside one, layer by layer.
19
Projects tracked
6
Operational
10
Countries
20.9 km
Cable km tracked (incl. planned)
| Project | Status | Announced | Commissioned | Location | Application | Length | Rating | Chemistry | Cooling | Key suppliers | Details |
|---|---|---|---|---|---|---|---|---|---|---|---|
| SuperNode – National Grid demonstrationSuperNode, National Grid Electricity Transmission | In Development | 2025 | National Grid test substation, United Kingdom | Grid transmission cable | SuperNode | ||||||
| VEIR pilot transmission linesVEIR | In Development | Nov 2022 | Woburn, Massachusetts (HQ), United States | Overhead & underground transmission | Up to 400 MW (initial products) | REBCO | Evaporative liquid nitrogen (open cycle) | VEIR | |||
| SCARLET (EU Horizon project)European Horizon Europe consortium | In Development | Sep 2022 | Multiple partner countries, European Union | MVDC cable development for renewables | REBCO, MgB2 | Liquid nitrogen (HTS) and liquid hydrogen (MgB2) concepts | Nexans, ASG Superconductors and consortium partners | ||||
| SuperRail – Paris MontparnasseSNCF Réseau | Under Construction | Jun 2022 | Paris (Montparnasse station), France | Railway power supply | 1,500 V DC / 3,500 A (5.3 MW per cable) | Liquid nitrogen | Nexans | ||||
| Shanghai Xuhui 35 kV cableState Grid Shanghai | Operational | Dec 2021 | Shanghai (Xuhui District), China | Urban grid cable | 1.2 km | 35 kV / 2,200 A | REBCO | Liquid nitrogen | Shanghai Superconductor (2G tape), Shanghai Cable Research Institute | ||
| ComEd Resilient Electric Grid (REG)Commonwealth Edison (ComEd) | Operational | Aug 2021 | Chicago (Northwest substation), United States | Grid resilience cable | 200 m | 12 kV / 3 kA (62 MVA) | REBCO | Liquid nitrogen | Nexans (cable), AMSC (REG system & Amperium HTS wire) | ||
| SuperLinkStadtwerke München | In Development | 2020 | Munich, Germany | Grid transmission cable (110 kV network) | 12 km (planned) | 110 kV / 500 MVA | REBCO | Subcooled liquid nitrogen closed loop | NKT (cable), THEVA (HTS tape), Linde (cryogenics) | ||
| St Petersburg HTS DC lineRosseti | Operational (pilot) | Apr 2020 | St Petersburg, Russia | DC grid transmission | 2.5 km | 20 kV DC / 50 MW | Bi-2223/Ag | Reverse-Brayton cryocoolers (12 kW at 70 K) | Rosseti R&D Centre | ||
| KEPCO Shingal–Heungdeok lineKEPCO | Operational | Jul 2019 | Yongin, Gyeonggi, South Korea | Grid distribution cable | 1 km | 23 kV / 50 MVA | REBCO and BSCCO | Circulating liquid nitrogen | LS Cable & System | ||
| HL-LHC Superconducting LinksCERN | Under Construction | 2016 | Geneva, Switzerland | Accelerator magnet power transfer | ~140 m per link | 120 kA DC (19-cable bundle) | MgB2 | Forced-flow gaseous helium (up to 25 K) | ASG Superconductors (MgB2 wire) | ||
| Shenzhen Ping'an concentric cableChina Southern Power Grid (Shenzhen Power Supply) | Operational | 2016 | Sep 2021 | Shenzhen, China | Urban grid cable (CBD supply) | 400 m | 10 kV / 2,500 A (43 MVA) | REBCO | Liquid nitrogen | Shenzhen Power Supply project consortium | |
| BEST PATHS MgB2 DC cableBEST PATHS consortium (EU FP7) | Concluded | 2014 | 2017 | Multiple partner countries, European Union | HVDC transmission cable demonstration | 30 m | 320 kV DC / 10 kA (3.2 GW) | MgB2 | Helium gas (20 K, 20 bar) around the MgB2 conductor; liquid-nitrogen (70 K) outer envelope | Nexans (cable), Columbus Superconductors / ASG (MgB2 wire) | |
| Ishikari DC cable projectChiyoda Corporation and Chubu University (with Sumitomo Electric, Sakura Internet) | Concluded | 2013 | May 2015 | Ishikari, Hokkaido, Japan | DC cable demonstration (solar-to-data-centre link) | 1 km (Line 2), 500 m (Line 1) | 10 kV DC / 5 kA (Line 1), 2.5 kA (Line 2) | DI-BSCCO (Bi-2223) | Liquid nitrogen | Sumitomo Electric (DI-BSCCO tape) | |
| Yokohama demonstrationTEPCO | Concluded | Oct 2012 | Yokohama, Japan | Grid cable demonstration | 240 m | 66 kV / 200 MVA | BSCCO-2223 (DI-BSCCO) | Liquid nitrogen | Sumitomo Electric | ||
| AmpaCityRWE / Westnetz | Concluded | 2011 | Apr 2014 | Essen, Germany | Urban grid cable + fault current limiter | 1 km | 10 kV / 2,300 A (40 MVA) | BSCCO-2223 | Subcooled liquid nitrogen | Nexans (cable & fault current limiter) | |
| LIPA HolbrookLong Island Power Authority | Operational | Apr 2008 | Holbrook, Long Island, New York, United States | Grid transmission cable | 600 m | 138 kV / 574 MVA | BSCCO-2223 | Liquid nitrogen (Air Liquide) | Nexans (cable), AMSC (HTS wire), Air Liquide (cryogenics) | ||
| Project HYDRA (Con Edison)American Superconductor with Consolidated Edison (US Department of Homeland Security funded) | Concluded | 2007 | New York City (prototype tested at Oak Ridge National Laboratory), United States | Fault-current-limiting grid cable | 170 m (Phase 2), 25 m (prototype) | 13.8 kV / 4 kA (96 MVA) | REBCO (2G HTS) | Liquid nitrogen | AMSC (2G HTS wire), Ultera (Southwire / nkt Cables) | ||
| Albany HTS cableNational Grid / Niagara Mohawk | Concluded | Jul 2006 | Albany, New York, United States | Grid cable demonstration | 350 m | 34.5 kV / 800 A | BSCCO-2223 (30 m REBCO section from 2008) | Liquid nitrogen | Sumitomo Electric (cable), SuperPower (2G wire), BOC/Linde (cooling) | ||
| Southwire CarrolltonSouthwire | Concluded | Feb 2000 | Carrollton, Georgia, United States | Industrial plant feed | 30 m | 12.4 kV / 1,250 A | BSCCO-2223 | Liquid nitrogen | Southwire |
Reference this table in Excel
In Excel choose Data → Get Data → From Web, paste this page's address (https://superconductortracker.com/projects) and click OK. Excel detects the projects table automatically; select it in the Navigator window and click Load.